| Question: | |||||||||||||||||||
| Are there any belt training problems? | |||||||||||||||||||
| Answer: | |||||||||||||||||||
| On most conveyors, the shortest ones are harder to train. We incorporate crowned head and tail pulleys to help in the training. We have not experienced training problems on any conveyor longer than 100 feet (30 meters). One of the most important aspects of our design is to centrally load the conveyor. We design the load point and belt loader based on the conditions provided by the client. | |||||||||||||||||||